The software lifecycle, now that code is cheap

· #ai #process #teams

Every way of building software that you have heard of, from waterfall to Scrum, was designed around one fact: writing code is slow and expensive. Requirements documents, sprint planning, estimation and code review all exist to make sure that scarce developer time is spent on the right thing and spent carefully.

That fact no longer holds. A coding agent can turn a clear description into a working change in minutes, and can run several such changes at once. In 2025, 90% of technology professionals said they used AI at work (DORA).

You might expect the result to be simple: the same process, only faster. It is not. When one step becomes almost free, the others become the bottleneck, and the process has to be rearranged around them. This post shows what that rearranged process looks like. Rather than describe it in the abstract, it follows one team through one feature, from the first conversation to the weeks after release. At each step it stops to name the idea behind what the team is doing, and to say where that idea comes from.

You do not need to write code to follow it. The team and the feature are invented. The research is real.

The team

The team builds the ordering part of a grocery delivery app. Like most product teams, it owns its part of the product end to end: building it, running it and fixing it. In the language of Team Topologies, it is a stream-aligned team, and it relies on a separate platform team for shared infrastructure such as build pipelines and hosting (Martin Fowler).

Role Accountable for
Product owner Which problems to solve, in what order; the functional requirements; whether the result was worth building
Customer journey manager (CJM) What customers actually experience, from opening the app to receiving the order; the cases a requirement forgets
Engineering lead The technical design of the team’s services; engineering standards; the review and release policy; on-call
Developers Technical analysis and design of each feature; implementation; everything that merges
QA engineer How the team knows the software works: tests derived from requirements, checks, release readiness
Architect (shared with five other teams) Decisions that cross team boundaries; the reference architecture and the standards every team follows

Three of these roles need a word of explanation.

The customer journey manager is not a standard role on an engineering team. It is here on purpose. When building is cheap, the expensive mistake is building the wrong thing well. Someone has to keep asking whether a change helps the people who use it, both before the work starts and after it ships.

The engineering lead is the team’s technical lead, not a people manager. In this team, technical design is engineering work, done by the people who will build and run the system, and the engineering lead is accountable for it. The architect is not the team’s designer. The architect owns the boundaries between teams and the rules that apply to all of them.

The architect is shared. One architect for six teams cannot review every design, and as you will see, does not try to.

An agent can draft work for every role in the table, but it cannot hold any of them. That distinction is the subject of this post.

What changed

Three findings from the last two years frame everything that follows.

The bottleneck moved. Many teams adopted coding agents and kept everything else unchanged: the same approval steps, the same reviews, the same handoffs. They found that the gains stalled. Anthropic’s AI-native SDLC playbook gives security review as an example. A security team sized for human output cannot keep up when agents multiply the amount of code. Either the review queue grows, or code ships without proper review. Neither is acceptable, so the review itself has to change.

AI amplifies whatever is already there. Google’s DORA research programme, which has studied software delivery performance for over a decade, puts it plainly. AI magnifies the strengths of well-run organisations and the dysfunctions of struggling ones (DORA). A team with good tests, small changes and a reliable pipeline gets faster. A team without them produces technical debt faster. DORA’s 2025 data shows both effects at once: higher AI adoption goes with more delivery throughput and more delivery instability.

Speed is hard to feel accurately. In a 2025 randomised trial by the research group METR, experienced open-source developers took 19% longer to finish tasks when they used AI tools. Afterwards they still believed the tools had made them 20% faster (METR). METR’s early-2026 follow-up, with newer tools, points to a speedup instead. But METR calls its own new data weak evidence, because many developers now refuse to take part in a study that asks them to work without AI (METR, 2026). The conclusion that survives both studies is that gut feeling is not a measurement.

DORA’s 2026 report on the return on AI investment adds a warning about timing. Most organisations go through a J-curve: productivity first dips, then rises. The dip has three causes: people learning new ways of working, the time spent checking AI output, and downstream processes that were never built for the new volume of change (InfoQ summary of the DORA report). Leaders who read the dip as failure and cut funding lose the return that would have followed.

With that in mind, here is the team’s week.

The lifecycle at a glance

The team’s process is a loop of eight stages. Every stage leaves behind a small written artifact, kept in the same repository as the code, and most stages end at a gate, where a named role makes a decision.

Discover ► Specify ► Design ► Plan ► Build ► Verify ► Release ► Learn
   G1        G2        G3      G4              G5       G6        │
   ▲                                                              │
   └────────── what we learned becomes the next intent ───────────┘
Stage Artifact Gate: who decides
Discover intent.md: the problem and how success will be measured G1: the product owner accepts the intent
Specify spec.md: what the software must do and how well, as testable statements G2: the product owner signs the spec; the engineering lead agrees the quality targets
Design design.md and decision records: how it will be built G3: the engineering lead approves; the architect decides anything that crosses a team boundary
Plan plan.md: the steps the agent will take G4: the developer accepts the plan
Build Code and tests No gate; standards and checks constrain the agent
Verify A pull request with test results and review findings G5: a code owner approves the merge
Release A release record G6: release to customers, gradually
Learn An outcome report or incident record Feeds the next intent

The shape is based on the loop in Anthropic’s playbook, with one deliberate difference, explained under Wednesday: the playbook folds requirements and technical design into a single spec, and this team keeps them apart. The playbook makes another point worth repeating: the chain of artifacts is also the audit trail. It shows who asked for what, what the agent produced and who approved it. Nobody has to reconstruct a decision from chat logs months later.

Monday: a problem, not a ticket

The customer journey manager opens the week with data. Support tickets and app analytics show the same pattern: customers who order every week rebuild nearly the same basket each time, and some of them give up halfway. Customers who give up often do not come back for a while.

In an older process, this would become a ticket that said “Add recurring orders”, and the conversation would move straight to solutions. Instead, the product owner asks an agent to draft an intent: a short document that states the problem, who has it, and how the team will know it is solved. The product owner and the CJM edit the draft together. The final version is half a page:

# Intent: help weekly customers reorder without rebuilding the basket

Problem: about a third of customers order every week, and most of their
basket is the same each time. Rebuilding it takes several minutes, and
some customers abandon the order partway through.

Outcome: weekly customers complete their order faster and abandon fewer
orders. Measure: median time to complete a repeat order, and the share
of abandoned repeat orders, four weeks after release.

Out of scope: subscriptions with automatic payment.

The product owner accepts it. That is gate G1.

The idea: start from the outcome, not the output. Kief Morris, writing on Martin Fowler’s site, describes software work as two nested loops (Humans and Agents in Software Engineering Loops). The why loop turns an idea into an outcome and learns from the result. The how loop produces everything in between: code, tests, designs and infrastructure. These intermediate artifacts, Morris points out, are a means to an end. Agents are increasingly good at the how loop. The why loop stays with people, because people are the ones who want what it produces.

Writing the outcome down first matters more than it used to. When a feature took a month to build, the cost of building the wrong thing was obvious, so teams argued about it up front. When it takes an afternoon, it is tempting to skip the argument, build something and see. That works for experiments. For anything that ships to customers, the intent is what lets the team tell, four weeks later, whether the afternoon was well spent.

Tuesday: write down what, and how well

The next step is a specification. It says what the software must do and how well it must do it, precisely enough to test, and it says nothing yet about how it will be built. It has two kinds of content.

Functional requirements describe behaviour: what happens when a customer does something. The agent drafts them from the intent. The CJM adds the cases that only someone close to customers would think of. Here is one of them:

Scenario: an item in the saved basket is out of stock
  Given a customer has a saved weekly basket with 12 items
  And one of those items is out of stock today
  When they choose "Repeat last week's order"
  Then the other 11 items are added to the basket
  And the missing item is shown with a suggested replacement
  And nothing is substituted without the customer's confirmation

Scenarios in this Given, When, Then form are useful to everyone. The product owner can read them as requirements. The QA engineer can turn each one into an automated test. The agent can use them to check its own work. The product owner owns the functional requirements.

Non-functional requirements (NFRs) describe qualities: how fast, how reliable, how secure. Most of them are not written per feature. The architect maintains an organisation-wide baseline: every customer-facing request must respond within a set time, personal data must stay in approved stores, every screen must meet the accessibility standard, and so on. This baseline is published as shared instructions that every agent loads, so the agent applies it while drafting. The spec adds only what is specific to this feature:

Quality targets
- "Repeat last week's order" fills the basket within 1 second
  for 95% of customers.
- If the stock service is slow or down, the basket is still filled;
  items are marked "availability unknown" instead of failing the action.
- No new personal data is stored.

The product owner decides which qualities matter to customers, for example that the action must never simply fail. The engineering lead agrees that the numbers are realistic and measurable. The QA engineer checks that each one can be turned into an automated check. With both parts agreed, the product owner signs the spec. That is gate G2.

The idea: spec-driven development, sized to the change. Writing a spec before handing work to an agent is now common enough to have a name, spec-driven development, and tools built around it, such as GitHub’s open-source Spec Kit. The reasoning is simple. An agent given a vague request fills the gaps with guesses. An agent given a precise description of the behaviour, with examples, guesses less, and can test what it built against the examples.

Birgitta Böckeler, also writing on Martin Fowler’s site, separates three levels of commitment (Understanding Spec-Driven Development):

  • Spec-first. A spec is written before the work and used to guide it.
  • Spec-anchored. The spec is kept after the work and updated whenever the feature changes.
  • Spec-as-source. People edit only the spec; the code is always generated from it.

The article also gives a useful warning. Asked to fix a small bug, one spec-driven tool produced four user stories with sixteen acceptance criteria. Böckeler compares the experience to using a sledgehammer to crack a nut. The lesson is that the depth of the spec should match the size and risk of the change, a point this post returns to below. Recurring orders is a real feature with real edge cases, so it earns a real spec. A typo fix does not.

The team works spec-anchored. When behaviour changes, the spec changes in the same pull request. A spec that has drifted from the code is worse than no spec, because people trust it.

Wednesday: the technical design

The spec says what the system must do. The design says how. This is where business rules become a domain model, where the team decides which service owns the change and where its data lives, and where each quality target gets a concrete technical answer.

One of the developers leads the design, working with an agent. The agent is good at the groundwork. It reads the existing code and finds the services, data models and patterns the change will touch. It lists the business rules implied by the spec and checks them for gaps and contradictions. It drafts two or three options and the trade-offs of each, checked against the architect’s reference architecture. The developer’s job is to judge those options. That judgement needs things the agent does not have: how the system behaves in production, what the team can operate at three in the morning, and what the other teams are planning.

Technical analysis of the business rules. The agent’s first pass turns up a question the spec did not answer. When a customer repeats last week’s order, which price applies: last week’s or today’s? It is a business rule, not a technical one, so the developer does not decide it. The question goes back to the product owner, who decides on today’s prices, with a notice if the total has changed by more than a set amount. The answer is added to the spec. Catching this on Wednesday costs a message. Catching it after release would have cost refunds.

The design document records the decisions. It is short, because it records only what is new or different:

# Design: repeat last week's order

Domain model
- No new entities. A repeat is a command on Basket that reads the
  customer's latest completed Order and adds its OrderLines.
- New value: AvailabilityStatus (in stock / out of stock / unknown).

Service boundaries
- Lives in the existing basket service. Reads order history and stock
  through their existing APIs. No new service.

Data
- No new tables or stores. One new index on orders (customer, completed_at)
  so the latest order is found in one lookup.

Quality targets → tactics
- 1 s for 95%: one batched stock request for all items, not one per item.
- Stock service down: 300 ms timeout, then fill the basket with
  AvailabilityStatus = unknown.
- Double taps and retries: the action carries an idempotency key, so
  repeating the request never adds the items twice.

Cross-team impact
- Adds up to 3x read traffic to the stock service at peak.
  Agreed with the inventory team; recorded in ADR-0042.

Two decisions in this document are worth a closer look.

First, the agent’s preferred option was a new microservice dedicated to reordering. The engineering lead rejected it. A separate service earns its cost when part of a system needs to scale, be deployed or be owned independently. Repeating an order needs none of that. It would have added a network call, a deployment, an on-call rota and a new failure mode to save a few hundred lines in an existing service. Choosing a pattern because it fits, not because it is available, is exactly the kind of judgement that stays with people.

Second, the change crosses a team boundary: it triples the read traffic to another team’s stock service at peak. Under the architect’s rules, any change that significantly alters the load on another team’s service, or changes its interface, needs that team’s agreement and an architecture decision record (ADR), a one-page note of a decision, its context and its consequences. The two teams agree within the day. The architect reads the ADR, approves it and does not need to see the rest of the design. Had the change needed a new kind of database or a new interface between teams, the architect would have made that decision.

The engineering lead reviews the design and approves it. That is gate G3.

The idea: separate what from how, and give each an owner. Anthropic’s playbook merges requirements and design into a single spec, drafted by the agent and signed by the product owner, and asks the product owner to consult a technical lead for higher-risk changes. That works for small and well-understood changes. For anything with real technical choices, it leaves a gap: a product owner can judge whether the behaviour is right, but not whether a service boundary, a data store or a caching strategy is. This team keeps the two documents apart because they have different owners:

Question Where it is answered Who owns the answer
What must the software do? spec.md, functional requirements Product owner, with the CJM
How well must it do it? Organisation baseline plus spec.md quality targets Architect for the baseline; product owner and engineering lead for the feature
Which entities, rules and states are involved? design.md, domain model Developer leading the design
Which service owns it? New service or existing one? design.md, service boundaries Engineering lead
Which kind of data store, and what structure? design.md, data Engineering lead; the architect if it is a new kind of store
How is each quality target met? design.md, tactics Developer leading the design, approved by the engineering lead
Anything affecting another team An ADR Architect, with the teams involved

The agent drafts almost every answer in this table. People own all of them.

Thursday morning: the plan comes before the code

With the design approved, the other developer picks up the work. Before the agent edits a single file, the developer asks it for a plan: which files will change, in what order, and how each step will be tested. The plan is short, because the hard decisions were made on Wednesday:

# Plan: repeat last week's order

1. Add the index and the query for a customer's latest completed order.
   Test: returns the latest order; ignores cancelled orders.
2. Add the repeat command to Basket, with the batched stock request,
   the timeout and the idempotency key.
   Test: one test per scenario in spec.md, plus stock service down,
   plus a repeated request.
3. Add the "Repeat last week's order" button to the order history screen.
   Test: UI test for the happy path and the out-of-stock message.
4. Record time-to-complete for repeat orders (needed for the outcome metric).

The developer notices that the plan says nothing about the price-change notice the product owner asked for on Wednesday. They ask for it to be added as a step, then accept the plan. That is gate G4.

The idea: review the plan, not just the code. Reviewing a plan takes two minutes. Reviewing the code that results from a wrong plan takes an hour, and the code then has to be thrown away. The cheapest place to catch a misunderstanding is before anything is built. The missing step above was not bad code but a missing requirement, and it was visible in a list of four lines.

The fourth step in the plan is easy to miss and important. The intent promised a measurement. If the code does not record it, nobody will know in four weeks whether the feature worked.

Thursday afternoon: the agent builds, the team steers

The agent works through the plan. For steps one and two it writes the code and the tests, runs them, reads the failures and fixes them, all without help. The developer reads the result at the end, not each line as it appears. Meanwhile, the second developer has another agent working on step three in parallel, because the two steps do not depend on each other.

Halfway through, the developer notices that the agent has written its database query in a style the team abandoned a year ago. It is not wrong, but it is not how the team does things.

There are two ways to deal with this. The developer could fix the query, or tell the agent to fix it. Or they could ask why the agent did it that way. The answer is that nothing told it otherwise. The team’s instruction file, the document every agent reads before it starts, says nothing about queries. So the developer adds two lines to the instruction file, and the agent, and every agent after it, gets it right.

The idea: humans on the loop, and harness engineering. Kief Morris describes three positions a person can take relative to an agent (Humans and Agents in Software Engineering Loops):

  • Outside the loop. The person says what they want and accepts whatever comes back. This is what is often called vibe coding. It is fine for a prototype, and risky for anything customers depend on.
  • In the loop. The person inspects everything the agent produces, line by line. Quality stays high, but the person becomes the bottleneck: agents produce code faster than anyone can read it.
  • On the loop. The person builds and improves the system the agent works inside: the instructions, the specs, the designs, the tests and the checks. Morris calls this system the agent’s harness, and the practice of maintaining it harness engineering.

The difference shows when the output is wrong. A person in the loop fixes the output. A person on the loop fixes whatever produced it, so that the mistake does not happen again. That is what the developer did with the instruction file.

This is also how one architect can serve six teams. The architect no longer reviews each team’s designs one at a time. Instead, the reference architecture, the NFR baseline and the organisation’s standards are written as shared instructions and skills: packaged guidance that agents load when a task needs it, such as how to design an interface between services or handle personal data. Every agent in every team starts from those standards, and every design the agents draft already follows them. The architect’s attention goes to the few decisions that genuinely cross boundaries, like the ADR on Wednesday.

Friday: verification is a system, not a phase

The developer opens a pull request: the proposed change, waiting for approval before it joins the main code. Before any person looks at it, three layers of automated checking run:

  1. The tests. These include one test for each scenario in the spec, which the QA engineer generated from spec.md on Tuesday, before the code existed, and a load test for the 1-second target. If a scenario or a quality target has no check, the build fails.
  2. Automated scans. Security scanning, dependency checks and a search for secrets accidentally left in the code.
  3. An AI reviewer. A second agent reviews the change against the team’s standards, the spec and the design, and labels each finding by importance.

The author’s agent has already seen most of these results and fixed what it could. When the code owner for the basket service opens the pull request, the routine problems are gone. The reviewer spends their time on two questions only a person can answer. Does this change do what the intent asked for, in the way the design said? And what could go wrong for customers if it does not? They approve the merge. That is gate G5.

The idea: the verification tax, and where review effort should go. DORA’s research describes a verification tax: time saved writing code is often spent again checking it (DORA). Thirty percent of developers in the 2025 survey reported little or no trust in AI-generated code. Checking is also a different and more tiring kind of work than writing. One engineer quoted in the research put it as spending less time writing code and more time “babysitting the AI”.

The cost falls hardest on reviewers. An author with an agent can produce a large change in minutes, and the reviewer is still expected to read all of it. DORA’s recommendations follow from this:

  • Move automated feedback to the author. Catch problems while the code is being written, not after it has been handed to someone else.
  • Use review agents to enforce standards, so that human reviewers do not have to.
  • Work in small batches. A small change is easier to review, test and undo than a large one, and agents make large changes dangerously easy.

The QA role has changed the most. In an older process, QA tested the software near the end, after it was built. Now the QA engineer owns the system that decides whether software is good enough: which scenarios and quality targets become checks, which checks run on every change, and what must be true before a release. Less time goes on testing by hand, more on making sure the automated checks would catch a real problem. A test suite written by an agent can pass while testing very little, so part of the job is checking the checks.

One rule does not bend: an agent never approves its own work. The agent that wrote the change cannot approve it, and an AI reviewer’s findings never count as an approval. A named person merges every change. The playbook builds this into the platform rather than leaving it to good intentions. Branch protection, the repository setting that blocks unreviewed changes from reaching the main code, requires a code owner’s approval whatever the automated checks say.

Monday again: release in small steps

The engineering lead owns the release. The pipeline builds the change and releases it to 5% of customers first. For an hour, it watches error rates, response times and order completion against the other 95%. Then it widens the release in steps. Nobody sits watching graphs: if the numbers had turned bad, the pipeline would have rolled the change back on its own and alerted the on-call developer.

For this feature, the engineering lead approves the start of the rollout personally. That is gate G6. For the team’s smallest changes, nobody does. The engineering lead approved a release policy once, in advance, and the pipeline applies it. A person still owns the gate, but the decision was made before the change existed.

The idea: let risk set the process. The team does not run every change through the same process. They sort changes by how much harm a mistake could do, and adjust each stage to match:

Fix a typo on the help page Repeat last week’s order Change how payments are captured
Intent One line in the ticket Half a page, with an outcome measure Full intent, reviewed with the finance team
Spec None Scenarios and feature quality targets Full spec, with compliance requirements
Design None Design note, approved by the engineering lead Full design, reviewed by the engineering lead and the architect, with ADRs
Plan Agent’s plan, accepted at a glance Plan reviewed by the developer Plan reviewed by the developer and the engineering lead
Code review Code owner, briefly Code owner, focused on intent and risk Two reviewers, one from the payments team
Release Automatic, under the approved policy Gradual rollout, started by the engineering lead Gradual rollout, with a named release manager and a rehearsed rollback

The principle is that the strength of a gate should follow the risk of the change, not the habits of the team. A process heavy enough for payments would smother the help page. A process light enough for the help page would be reckless for payments.

DORA’s research supports the conditions that make this safe. Among the seven capabilities it found to amplify the benefits of AI are strong version control with easy rollback, working in small batches, and a quality internal platform (DORA AI Capabilities Model). A gradual rollout that undoes itself is what lets the team release without fear.

Four weeks later: did it work?

The feature shipped quickly. The intent did not ask for speed, though. It asked whether weekly customers would reorder faster and abandon fewer orders.

Four weeks after release, the product owner and the CJM look at the numbers the fourth step of the plan made possible. The median time to complete a repeat order has fallen sharply. Abandoned repeat orders are down, but by less than they hoped. The CJM reads the support tickets and finds the reason. When a saved item is out of stock, the suggested replacement is often a different brand at a different price, and some customers do not trust it.

That finding becomes a new intent.md, and the loop starts again.

The idea: close the loop. The last stage is the one most often skipped. A team that measures only what it shipped will ship a lot and learn little. Production data, support tickets and customer behaviour are the input to the next round of work, whether it is a new feature or an incident that needs a fix.

Morris takes this one step further and calls it an agentic flywheel (Humans and Agents in Software Engineering Loops). Agents are given the results (test outcomes, pipeline data, production metrics) and asked to suggest improvements to the harness itself. At first people review every suggestion. As trust grows, some kinds of suggestions can be applied automatically. The team is not there yet. The engineering lead has asked an agent to read each month’s failed builds and propose changes to the instruction files, and reviews the proposals personally.

What changed for each role

The team still has the same roles it had before agents. What each role spends its time on has shifted.

Role Less time on More time on
Product owner Writing tickets and acceptance criteria by hand Choosing problems, stating outcomes, answering business-rule questions, judging results
Customer journey manager Producing research summaries Edge cases in specs; checking outcomes after release
Engineering lead Chasing status and reviews Technical design decisions, review and release policy, the health of the harness
Developers Typing code Technical analysis and design, planning, steering agents, judging intent and risk in review
QA engineer Testing by hand, late Owning the verification system: checks from requirements, release readiness
Architect Reviewing designs one at a time The reference architecture and NFR baseline as shared skills; cross-team decisions

One risk runs across all of them. DORA calls it the expertise paradox (DORA). AI lets people work productively in areas they do not know well, which is valuable. But it can also skip the struggle through which people build real expertise, and leave them unable to tell when the AI is wrong. That matters most in design. A developer who has never had to choose between two data models will accept whichever one the agent proposes. A team in which nobody can judge the agent’s output has no gates, only rubber stamps. The team deals with this in small ways: developers still write some code and some designs by hand, rotate through unfamiliar parts of the system, and treat every escaped bug as a question about the harness, not just a bug to fix.

How the team measures it

The team does not measure lines of code, the share of code written by AI, or the number of pull requests. All three are easy to inflate and say nothing about whether customers are better off. DORA’s advice is to measure impact, not output (DORA). The team’s scorecard:

Measure What it tells them
Time from accepted intent to customers Real speed, including the stages before and after the code
How often they release, and how often a release fails Speed against stability; the two must be read together
Time to recover from a failure Whether gradual rollout and rollback actually work
How long pull requests wait for review Whether the review queue is becoming the bottleneck
Bugs found by customers rather than by checks Whether the verification system is doing its job
The outcome measure in each intent.md Whether customers benefited, not just whether the team shipped
AI cost per change released Whether the spending is proportionate

They took a baseline before changing their process, and they compare against it every quarter. Given the METR results, they do not ask people how much faster they feel.

If you want to start

The full process above took the team months to reach, and nobody should adopt it in one go. A reasonable order:

  1. Fix the foundations first. A fast, reliable test suite and pipeline, small changes, easy rollback. These amplify everything else, and without them agents mostly produce instability faster. Write down a clear policy on how the team may use AI; DORA lists a clear and communicated AI stance as the first of its seven capabilities.
  2. Take a baseline. Record the scorecard before changing anything, so you can tell later whether a change helped.
  3. Add the cheap gates. Ask the agent for a plan before it writes code, and review the plan. Give every agent the same instruction file, and change the file instead of the output when something goes wrong.
  4. Write intents and specs for real features. Start with an outcome measure, a handful of scenarios and the quality targets that matter. Keep the spec in the repository and update it with the code.
  5. Make design ownership explicit. Decide who designs inside the team and who decides across teams. Write the reference architecture and NFR baseline down as shared instructions, so agents follow them while drafting.
  6. Move review effort to where it matters. Automate standards checks, use an AI reviewer, and keep people focused on intent and risk. Never let an agent approve its own work.
  7. Sort changes by risk. Lighten the process for the small and safe; keep it heavy for the risky. Revisit the sorting every quarter and drop any gate that adds delay without ever catching anything.

Expect the J-curve. The first months will feel slower, because people are learning, checking more and fixing processes that were built for a different speed. That dip is the cost of the change, not proof that it failed.

A note on security. An agent that can change code, run commands and read tickets can also be tricked by text written to manipulate it, for example instructions hidden in a bug report. Treat everything an agent reads as data, not as instructions. Give agents only the access they need, and keep the gates that a person owns. The OWASP project publishes a Top 10 for Agentic Applications that is a good place to start a threat model.